OG-5, OG-6, FB PROFILES: INSTALLATION GUIDE:

Duragutter is an engineered system with easy to follow, step-by-step instructions.
​
Installers must review both this installation guide and the installation videos prior to installation. ​​​​​​​​​​​​​​​
​​

​OVERVIEW​​​​​​​​​​​​
​TABLE OF CONTENTS​​​​​​​​​​​​​
General Installation Notes ...................................................................................................​...........................................
Specialized Tools Required .............................................................................................................................................
Cutting OG-5, OG-6, FB Gutter ............................................................................................................
Joining Straight Sections (Butt Joints) ...........................................................................................................................
Making Inside and Outside Miters .................................................................................................................................
Installing End Caps and Internal Plugs...........................................................................................................................
Installing Outlets ..............................................................................................................................................................
Attaching Gutter to Fascia ..............................................................................................................................................
Installing Integral Flashing ..............................................................................................................................................
Installing Leaf Guard ........................................................................................................................................................​​​​​​​​​​​​​​​
​​
General Installation Notes​​​​​​​​​​​
​​
Plan the work sequence. Always make inside miters before outside miters.​
​
Use only glues and sealants supplied or approved by Duragutter.
​
When working with short lengths, it may be easier to assemble joints at waist level and then lift the assembled unit into place.
​
Use ear and eye protection when cutting Duragutter. Use dust collection or cut over a tarp or sweepable surface. ​​​​​​​​​​​​​​
​​​​​​​​​​​​​
-
12" sliding compound miter saw with minimum 80 tooth blade
​​
-
Bar clamp (minimum 5 1/2" throat depth) and miter clamp - we can include both in your order
​​​
-
7/16" drill bit ​
​​
-
2 1/2" carbide hole saw (if using 3" round outlet)
​​
Specialized Tools Required​​
​​
Cutting the Gutter

​​​
1

​​​​
2
-
Use a 12" sliding miter saw with a minimum 80 tooth blade.
​​
-
​Measure and mark piece.​​​​​​​​​​​​​
-
Cut gutter upside down with front facing forwards.​
​
-
Insert supplied wooden block to raise front edge of gutter and prevent deformation of profile when clamping​​​​​​​​​​​​​

​​​
3
-
Clamp front of gutter to saw fence - keep hands off gutter when cutting​​
​
-
To make a small piece, cut it off of a large piece. Do not try to clamp pieces smaller than 15". ​​​​​​​​​​​​​​​
​​​

​​​​
4
-
Cut slow and steady - 10 seconds per cut. Fast cuts risk kickback and rough edges.
​
-
​Make miter cuts are the same way. Ensure clamp is out of the way of the cut. ​​
​​


​​
Joining Straight Sections (Butt Joint)
​​​
1
​​​​
2
-
Test fit the joint to ensure accuracy before installing pins​​
​
-
​Apply 2P-10 Adhesive to one half of 3 straight pins, and slide the pins halfway into the pin grooves on gutter. ​​​​​​​​​​​​​
-
Apply 2P-10 Adhesive to other half of the pins and the edge of one gutter. Slide joint together. ​
​​
-
Clean any excess glue from outside surface of gutter with acetone rag immediately.​​​​​​​​​​​​​

​​​
3
-
Apply pre-cut tape. Peel a small amount at a time, start at back edge, and apply pressure with fingers to remove any air bubbles. ​

​​​​
4
-
Apply sealant in the grooves above the tape, and over the sides of the tape. ​​​​​​​​​​​​​​


​​
Making Inside Miters
​​​
1
​​​​
2
-
Test fit the joint to ensure accuracy before installing pins​​
​
-
​Apply 2P-10 Adhesive to one half of 3 straight pins, and slide the pins halfway into the pin grooves on gutter. ​​​​​​​​​​​​​
-
Apply 2P-10 Adhesive to other half of the pins and the edge of one gutter. Slide joint together. ​​​
​
-
Clean any excess glue from outside surface of gutter with acetone rag immediately.

​​​
3
-
Hold joint together and spray pins with 2P-10 Activator to instantly cure glue. If more working time is desired (approx. 5 mins), do not use Activator. ​
​
-
Do not spray Activator on the outside of the gutter, as it can permanently stain the finish. ​​

​​​​
4
-
Install 1st piece of tape starting at bottom inside corner.​​
​
-
Peel a small amount of tape backing at a time, carefully stick tape, and apply pressure with fingers to remove any air bubbles.
​
-
If temperature is below 35° F / 1.6° C, apply a small amount of 2P-10 Adhesive under tape.

​​​​
5
-
Install 2nd piece of tape on left side of joint.

​​​​
6
-
Install 3rd piece of tape on right side of joint. ​​​​

7
-
Install 4th piece of tape on back of joint, starting at the top. ​​​

​​​​
8
-
Apply sealant in the grooves above the tape, and over the sides of the tape. ​​​​​​​​​​​​​​